DepartmentSectionSection DescriptionResolution No.FeeDescriptionFee Amount
Building1.1Building Structural Fees18-2110Additions - Valuation$50.00 base fee plus $5.50 add'l for ea $1,000 of project value or fraction thereofProject Value: $72 per sq. ft
Building1.1Building Structural Fees20-2234After Hours Building Inspection FeeOccasionally we receive requests to perform after hours/overtime inspections due to contractor or owners needs to not disrupt existing business operations, or to help them maintain schedules.$52.93 Per Hour
Building1.1Building Structural Fees18-2110Application FeesCommercial project value < $20,000. (All plan review application fees are non-refundable. Fees will be applied to building permit)$50
Building1.1Building Structural Fees18-2110Application FeesCommercial project value > $20,000. (All plan review application fees are non-refundable. Fees will be applied to building permit)$150
Building1.1Building Structural Fees18-2110Application FeesFloodplain. (All plan review application fees are non-refundable. Fees will be applied to building permit)$25
Building1.1Building Structural Fees18-2110Application FeesMulti-family project value < $20,000. (All plan review application fees are non-refundable. Fees will be applied to building permit)$50
Building1.1Building Structural Fees18-2110Application FeesMulti-family project value > $20,000. (All plan review application fees are non-refundable. Fees will be applied to building permit)$150
Building1.1Building Structural Fees18-2110Application FeesResidential (additions, remodels, garages, sheds, other misc.). (All plan review application fees are non-refundable. Fees will be applied to building permit)$50
Building1.1Building Structural Fees18-2110Application FeesResidential (new projects). (All plan review application fees are non-refundable. Fees will be applied to building permit)$150
Building1.1Building Structural Fees18-2110Certificate of Occupancy issuance (with no construction)Residential/Commercial Accounts$110
Building1.1Building Structural Fees18-2110Commercial Plan Check fee (Non-refundable. Fees will be applied to permit) 65% of Building Permit Fee
Building1.1Building Structural Fees18-2110Contractor Change after permit issue.(New Permit must be issued with new contractor information)$50
Building1.1Building Structural Fees18-2110Covered patios / Storage Sheds - Valuation$50.00 base fee plus $5.50 add'l for ea $1,000 of project value or fraction thereofProject Value: $16 per sq. ft
Building1.1Building Structural Fees18-2110Demo FeeResidential/ Commercial Accounts$50
Building1.1Building Structural Fees18-2110Double fee (for re-inspection)Residential/ Commercial Accounts$90
Building1.1Building Structural Fees18-2110Garages - Valuation$50.00 base fee plus $5.50 add'l for ea $1,000 of project value or fraction thereofProject Value: $36.91 per sq. ft
Building1.1Building Structural Fees18-2110Mobile Home Set Up Fee  $50
Building1.1Building Structural Fees18-2110Permit Extensions prior to expirationResidential/ Commercial Accounts$50
Building1.1Building Structural Fees18-2110Plan ModificationCommercial project value < $20,000 (Non-Refundable. Will be applied to permit fee using Residential/Commercial Permit Fee Calculation Formula)$50
Building1.1Building Structural Fees18-2110Plan ModificationCommercial project value > $20,000 (Non-Refundable. Will be applied to permit fee using Residential/Commercial Permit Fee Calculation Formula)$150
Building1.1Building Structural Fees18-2110Plan ModificationMulti-family project value < $20,000 (Non-Refundable. Will be applied to permit fee using Residential/Commercial Permit Fee Calculation Formula)$50
Building1.1Building Structural Fees18-2110Plan ModificationMulti-family project value > $20,000 (Non-Refundable. Will be applied to permit fee using Residential/Commercial Permit Fee Calculation Formula)$150
Building1.1Building Structural Fees18-2110Plan ModificationResidential (Non-Refundable. Will be applied to permit fee using Residential/Commercial Permit Fee Calculation Formula)$50
Building1.1Building Structural Fees18-2110Re-Inspection FeesResidential/ Commercial Accounts$45
Building1.1Building Structural Fees18-2110Residential / Commercial Valuation$50.00 base fee plus $5.50 add'l for ea $1,000 of project value or fraction thereofProject Value: $94.06 (per BVD table)
Building1.1Building Structural Fees18-2110Residential/Commercial Permit Fee Calculation FormulaResidential/Commercial Accounts$50 base fee plus $5.50 add'l for ea $1,000 of project value or fraction thereof
Building1.1Building Structural Fees20-2230Temporary Certificate of Occupancy (TCO) FeeCommercial Temporary Certificate of Occupancy requests are very time consuming for the Community Development Department. These requests take time to process and include support from the permit counter, Land Development Section, Planning Division, and the Building Section.$114.75
Building1.1Building Structural Fees18-2110Woodstoves FeeResidential/ Commercial Accounts$50
Building1.1Building Structural Fees18-2110Work Commencing Without PermitResidential/Commercial AccountsDouble permit fees will be the minimum charge assessed
Building1.2Building Electrical Fees20-2234After Hours Electrical Inspection FeeOccasionally we receive requests to perform after hours/overtime inspections due to contractor or owners needs to not disrupt existing business operations, or to help them maintain schedules.$57.41/ Hour
Building1.2Building Electrical Fees18-2110Commercial, Industrial, and other permit feesa. Wiring costs $0.00 not exceeding $2,000. This section applies to all installations not specifically listed above. The total wiring cost shall be all labor and material to install the wiring system consistent with valuation data (market value for the geographic area).This section includes: lawn$40 plus 2.5% of total wiring cost
Building1.2Building Electrical Fees18-2110Commercial, Industrial, and other permit feesb. Wiring costs over $2,000 not exceeding $10,000. This section applies to all installations not specifically listed above. The total wiring cost shall be all labor and material to install the wiring system consistent with valuation data (market value for the geographic area).This section include$100 plus 1% of total wiring cost
Building1.2Building Electrical Fees18-2110Commercial, Industrial, and other permit feesc. Wiring cost over $10,000. This section applies to all installations not specifically listed above. The total wiring cost shall be all labor and material to install the wiring system consistent with valuation data (market value for the geographic area).This section includes: lawn sprinklers,$180 plus ½ of 1% of that portion
Building1.2Building Electrical Fees18-2110Double fee (for re-inspection) $90
Building1.2Building Electrical Fees18-2110Existing Residential $40 permit fee plus $10 for each branch circuit
Building1.2Building Electrical Fees18-2110Ground Grid $40
Building1.2Building Electrical Fees18-2110Hot Tubs, Swimming Pools, and other spas $40
Building1.2Building Electrical Fees18-2110Mobile Home Service Fee $50 permit fee plus $10 per each add'l branch circuit
Building1.2Building Electrical Fees18-2110Multi-family Dwellings – Duplexes $210
Building1.2Building Electrical Fees18-2110Multi-family Dwellings – DuplexesThree (3) or more multi-family units$120 per building plus $60 per unit
Building1.2Building Electrical Fees18-2110New Residentiala. Up to and including 200 amp service. Single family dwelling (includes everything contained within the residential structure and attached garage. All must be wired at the same time.)$120
Building1.2Building Electrical Fees18-2110New Residentialb. 201 amp service up to 400 amps. Single family dwelling (includes everything contained within the residential structure and attached garage. All must be wired at the same time.)$210
Building1.2Building Electrical Fees18-2110New Residentialc. 401 amp service and above. Single family dwelling (includes everything contained within the residential structure and attached garage. All must be wired at the same time.)Commercial fee schedule (Ref No. 2.2.09)
Building1.2Building Electrical Fees18-2110Re-Inspection Fee $45
Building1.2Building Electrical Fees20-2230Temporary power poles/construction servicesResidential 200 amps or less, one location. Every temporary power pole must be called in for inspection. Idaho Power will not set the meter until the temporary pole has passed city inspection. To be installed for construction purposes only for a period not to exceed one (1) year.$40
Building1.2Building Electrical Fees20-2230Temporary power poles/construction servicesResidential over 200 amps and all Commercial Construction Every temporary power pole must be called in for inspection. Idaho Power will not set the meter until the temporary pole has passed city inspection. To be installed for construction purposes only for a period not to exceed one (1) year.Commercial fee schedule (Ref No. 2.2.09)
Building1.2Building Electrical Fees18-2110Work constructed without a permit  Double permit fees will be the minimum charge assessed
Building1.3Building Mechanical Fees20-2234After Hours Mechanical Inspection FeeOccasionally we receive requests to perform after hours/overtime inspections due to contractor or owners needs to not disrupt existing business operations, or to help them maintain schedules.$56.51/ Hour
Building1.3Building Mechanical Fees18-2110Base Fee - Applied to all permits $50
Building1.3Building Mechanical Fees18-2110Double fee (for re-inspection) $90
Building1.3Building Mechanical Fees18-2110Exhaust and Ventilation Ducts(Exhaust or ventilation duct such as dryer vents, range hood vents, cook stove vents, bath fan vents and the similar exhaust and ventilation ducts.)First = $15 Each Additional $5 each
Building1.3Building Mechanical Fees18-2110Fireplace Only Permit (this is with gas piping already in place or permitted by others)$50 base permit fee plus Fixture charge of $35 for 1st and $15 for each additional fixture
Building1.3Building Mechanical Fees18-2110Fixtures and Appliances (Furnace, furnace-air conditioner combination, heat pump, air conditioner, evaporative cooler, unit heater, space heater, decorative gas fired appliance, incinerator, boiler, pool heater and similar fixtures or appliances.) First = $35 Each Additional $15.00 each
Building1.3Building Mechanical Fees18-2110Fuel Gas Piping(Fixture or appliance outlets for the fuel gas piping system.)First = $15 Each Additional $5.00 each
Building1.3Building Mechanical Fees18-2110Multi-Family and Commercial (as defined in the International Building Code)For projects $100,000 through $200,0001% of job value over $100,000 plus $2,250
Building1.3Building Mechanical Fees18-2110Multi-Family and Commercial (as defined in the International Building Code)For projects $20,000 or less3% of job value plus $50 base permit fee
Building1.3Building Mechanical Fees18-2110Multi-Family and Commercial (as defined in the International Building Code)For projects $20,000.01 through $100,000 2% of job value over $20,000 plus $650.00
Building1.3Building Mechanical Fees18-2110Multi-Family and Commercial (as defined in the International Building Code)For projects $200,000 or more½ % of job value over $200,000 plus $3,250
Building1.3Building Mechanical Fees18-2110Re-Inspection Fee $45
Building1.3Building Mechanical Fees18-2110Work constructed without a permit  Double permit fees will be the minimum charge assessed
Building1.4Building Plumbing Fees18-2110Other Plumbing feesDouble fee (for re-inspection)$90
Building1.4Building Plumbing Fees18-2110Other Plumbing feesRe-Inspections$45
Building1.4Building Plumbing Fees18-2110Other Plumbing feesWork commencing without a permitDouble permit fees will be the minimum charge assessed.
Building1.4Building Plumbing Fees18-2110Permit fee (each living unit)Backflow device$8
Building1.4Building Plumbing Fees18-2110Permit fee (each living unit)Each single family dwelling, or living unit in an apartment, condominium, townhouse or other multiple unit.$30
Building1.4Building Plumbing Fees18-2110Permit fee (each living unit)Fixture replacement permit fee$30
Building1.4Building Plumbing Fees18-2110Permit fee (each living unit)Lawn sprinkler permit fee$30
Building1.4Building Plumbing Fees18-2110Permit fee (each living unit)Mobile home connect or reconnect of water or sewer to existing stub outs$40
Building1.4Building Plumbing Fees18-2110Permit fee (each living unit)Per fixture$8
Building1.4Building Plumbing Fees18-2110Permit fee (each living unit)Replacement per fixture$8
Building1.4Building Plumbing Fees18-2110Permit fee (each living unit)Residential sewer / water combo fee (one inspection)$50
Building1.4Building Plumbing Fees18-2110Permit fee (each living unit)Residential sewer line or replacement$38
Building1.4Building Plumbing Fees18-2110Permit fee (each living unit)Water conditioner additional per unit fee$8
Building1.4Building Plumbing Fees18-2110Permit fee (each living unit)Water Conditioners$30
Building1.4Building Plumbing Fees18-2110Project Valuation Table:For projects $100,000 through $200,0001% of job value over $100,000 plus $2,230
Building1.4Building Plumbing Fees18-2110Project Valuation Table:For projects $20,000 or less3% of job value and $30
Building1.4Building Plumbing Fees18-2110Project Valuation Table:For projects $20,000 through $100,000 2% of job value over $20,000 plus $630
Building1.4Building Plumbing Fees18-2110Project Valuation Table:For projects $200,000 or more½% of job value over $200,000 plus $3,230
Building1.5Building Fire Fees18-2110Commercial Plan ReviewsApplication Fee (non-refundable deposit applied to permit)$100
Building1.5Building Fire Fees18-2110Commercial Plan ReviewsFire Code plan review30% of the Bldg Permit fee
Building1.5Building Fire Fees18-2110Commercial Plan ReviewsFire Sprinkler plan review base fee (up to 35 sprinkler heads)$150 plus $4.25 per device (if over 35)
Building1.5Building Fire Fees22-2306Commercial Plan ReviewsPlan review and inspection of new fire alarm system$150 plus $4.25 per device (if over 35)
Building1.5Building Fire Fees18-2110Commercial Plan ReviewsRe-Submittal review$75 per hour
Building1.5Building Fire Fees18-2110Commercial Plan ReviewsWork commencing without permitdouble permit fee
Building1.5Building Fire Fees18-2110InspectionsAdditional Inspections$65 per hour
Building1.5Building Fire Fees18-2110InspectionsAfter Hours Inspections$100 per hour
Building1.5Building Fire Fees18-2110InspectionsFinal Inspection in excess of one hour$65 per hour
Building1.5Building Fire Fees18-2110InspectionsFlammable Liquid Storage Tanks Review and Inspection$125 per tank
Building1.5Building Fire Fees18-2110InspectionsHazardous Material Review and Inspection$225
Building1.5Building Fire Fees18-2110InspectionsInspection of Commercial Hood Extinguishing Systems$125 per system
Building1.5Building Fire Fees22-2306InspectionsInspection of fire alarm system replaced or installed by limited electrical contractor, limited electrical installer, or employee of a company holding a limited electrical contractor license (Per Idaho Code section 54-1016(2).$125
Building1.5Building Fire Fees22-2306InspectionsInspection of replacement fire alarm system$150 plus $4.25 per device (if over 35)
Building1.5Building Fire Fees18-2110Storage Permits High Piled Combustible Storage$150 per building or area
Planning1.6Planning Fees18-2110Accessory use for daycare  $160
Planning1.6Planning Fees18-2110Accessory use for Home Occupation $53
Planning1.6Planning Fees18-2110Accessory use for Home Occupation that includes provision of lessons or instruction to a group of 7 or more students $160
Planning1.6Planning Fees18-2110Additional hearing (post reconsideration) $692
Planning1.6Planning Fees18-2110Alternative compliance $160
Planning1.6Planning Fees18-2110Annexation, staff prepared consensual $2,086
Planning1.6Planning Fees18-2110Annexation/rezone $1,826
Planning1.6Planning Fees18-2110Annexation/rezone w/out concurrent application $2,092
Planning1.6Planning Fees18-2110Certificate of zoning compliance $453
Planning1.6Planning Fees18-2110Certificate of zoning compliance w/prior approval $173
Planning1.6Planning Fees18-2110Certificate of Zoning Compliance, use $133
Planning1.6Planning Fees18-2110City council review (appeal) $692
Planning1.6Planning Fees18-2110Comprehensive plan map amendment $2,409
Planning1.6Planning Fees18-2110Comprehensive plan text amendment $1,431
Planning1.6Planning Fees18-2110Conditional use minor modification $378
Planning1.6Planning Fees18-2110Conditional use (or Commission level modification) $1,369
Planning1.6Planning Fees18-2110Design review $173
Planning1.6Planning Fees18-2110Development agreement $303
Planning1.6Planning Fees18-2110Development agreement modification $502
Planning1.6Planning Fees18-2110Director determination $160
Planning1.6Planning Fees19-2167Fence Permit $10
Planning1.6Planning Fees18-2110Inspections, additional $53
Planning1.6Planning Fees18-2110Miscellaneous hearing item $937
Planning1.6Planning FeesOrd. 19-1829Parklet Permit 0
Planning1.6Planning Fees20-2230Performance, Warranty and Development of Surety Agreement FeePerformance Surety and Warranty Surety, and the preparation of a formal Development Surety Agreement$233
Planning1.6Planning Fees18-2110Planned unit development $2,001
Planning1.6Planning Fees18-2110Planned unit development, Fire Department Review Fees $250 + $1 per lot
Planning1.6Planning Fees18-2110Planned unit development, per exception fee $107
Planning1.6Planning Fees18-2110Plat, combination $2,189
Planning1.6Planning Fees18-2110Plat, final $1,242
Planning1.6Planning Fees18-2110Plat, final per lot P&Z and PW fee $36
Planning1.6Planning Fees18-2110Plat, final, modification to condition $541
Planning1.6Planning Fees18-2110Plat, preliminary $2,104
Planning1.6Planning Fees18-2110Plat, preliminary Fire Department review fee $160 + $1 per lot
Planning1.6Planning Fees18-2110Plat, preliminary per lot P&Z and PW fee $24
Planning1.6Planning Fees18-2110Plat, short $868
Planning1.6Planning Fees18-2110Private road $198
Planning1.6Planning Fees18-2110Property boundary adjustment $365
Planning1.6Planning Fees18-2110Re- notice of a public hearing $183
Planning1.6Planning Fees21-2288Remand FeeRemand Fee$705.00
Planning1.6Planning Fees18-2110Review of Landscape Plan revisions $160
Planning1.6Planning Fees18-2110Sign $53
Planning1.6Planning Fees18-2110Sign, limited duration $27
Planning1.6Planning Fees18-2110Sign, Portable $27
Planning1.6Planning Fees20-2230Stand Alone 2 year Warranty Surety Agreementa stand-alone two-year Warranty Surety for public works infrastructure installations, and the preparation of a formal Warranty Surety Agreement.$180
Planning1.6Planning Fees20-2230Stand alone performance surety w/o a Formal Development Surety Agreementa stand-alone Performance Surety, without the preparation of a formal Development Surety Agreement$162
Planning1.6Planning FeesOrd. 19-1829Streetscape Sublicense 0
Planning1.6Planning Fees20-2230Surety Reduction FeeThis fee is intended to cover the process to reduce an existing surety at the time of expiration/renewal only. This fee would be applicable for each request.$69
Planning1.6Planning Fees18-2110Time extension, Commission or Council $493
Planning1.6Planning Fees18-2110Time extension, Director $133
Planning1.6Planning Fees18-2110Unified development code text amendment $1,723
Planning1.6Planning FeesOrd. 20-1889Use Zone Encroachment Permit 0
Planning1.6Planning Fees18-2110Vacations (including recorded plat notes) $589
Planning1.6Planning Fees18-2110Variance $1,056
Planning1.6Planning Fees18-2110Zoning verification letter $53
Public Works2.1Water and Sewer Fees23-2417Assessment FeesPressurized Irrigation for Secondary Connection: Residential/Commercial$525.00
Public Works2.1Water and Sewer Fees22-2344Assessment FeesWastewater - Fee per Equivalent Residential Unit (ERU) to connect to City of Meridian Water Service. Residential/ Multifamily/ Commercial$5,411
Public Works2.1Water and Sewer Fees22-2344Assessment FeesWater - Fee per Equivalent Residential Unit (ERU) to connect to City of Meridian Water Service. Residential/ Multifamily/ Commercial$1,514
Public Works2.1Water and Sewer Fees23-2417Engineering/Development ServicesQualified Licensed Professional Engineer (QLPE) Review (Any project reviewed per the provisions of Idaho Code 39-118 (2d.). The QLPE review fee includes only the engineering drawing sheets, and does not include cover sheets, standard details or note sheets.)$316.89
Public Works2.1Water and Sewer Fees23-2417Miscellaneous Wastewater Fee:Private Lift Station O&Mby individual agreement
Public Works2.1Water and Sewer Fees23-2417Miscellaneous Wastewater Fee:Private Sewer System Review$1,000.00
Public Works2.1Water and Sewer Fees23-2417Miscellaneous Wastewater Fee:Septage Dump (per 1000 gallons)$48.00
Public Works2.1Water and Sewer Fees23-2417Miscellaneous Water and Sewer FeeThird Party Billing Arrangement$20.00
Public Works2.1Water and Sewer Fees23-2417Private Fire Line Service1/2 inch line$3.75
Public Works2.1Water and Sewer Fees23-2417Private Fire Line Service10 inch line$32.00
Public Works2.1Water and Sewer Fees23-2417Private Fire Line Service2 inch line$7.50
Public Works2.1Water and Sewer Fees23-2417Private Fire Line Service3 inch line$10.00
Public Works2.1Water and Sewer Fees23-2417Private Fire Line Service4 inch line$15.00
Public Works2.1Water and Sewer Fees23-2417Private Fire Line Service6 inch line$22.00
Public Works2.1Water and Sewer Fees23-2417Private Fire Line Service8 inch line$28.00
Public Works2.1Water and Sewer Fees23-2403Sewer RateBase (administrative fee)$9.08
Public Works2.1Water and Sewer Fees23-2417Sewer RateEPA Compliance Fee$3.75
Public Works2.1Water and Sewer Fees23-2403Sewer RateUse Charge (Per 1000 gallons)$5.82
Public Works2.1Water and Sewer Fees23-2417Sewer System Repair Fee:CCTV Van with one Collections Technician (per hour)$56.06
Public Works2.1Water and Sewer Fees23-2417Sewer System Repair Fee:Collections Technician (per hour)$36.48
Public Works2.1Water and Sewer Fees23-2417Sewer System Repair Fee:Hydrocleaner Service Truck with one Collections Technician (per hour)$85.29
Public Works2.1Water and Sewer Fees23-2417Water Meters:1 1/2 inch C-2 Measuring Chamber Assembly$1,117.42
Public Works2.1Water and Sewer Fees23-2417Water Meters:1 1/2 Inch Meter (Irrigation) T2$1,161.98
Public Works2.1Water and Sewer Fees23-2417Water Meters:1 1/2 inch meter C2$1,697.88
Public Works2.1Water and Sewer Fees23-2417Water Meters:1 1/2 inch T-2 Measuring Chamber Assembly$775.76
Public Works2.1Water and Sewer Fees23-2417Water Meters:1 inch meter$233.40
Public Works2.1Water and Sewer Fees23-2417Water Meters:2 inch C-2 Measuring Chamber Assembly$1,117.42
Public Works2.1Water and Sewer Fees23-2417Water Meters:2 Inch Meter (Irrigation) T2$1,410.86
Public Works2.1Water and Sewer Fees23-2417Water Meters:2 inch meter C2$1,880.42
Public Works2.1Water and Sewer Fees23-2417Water Meters:2 inch T-2 Measuring Chamber Assembly$775.76
Public Works2.1Water and Sewer Fees23-2417Water Meters:3 inch C-2 Measuring Chamber Assembly $1,549.47
Public Works2.1Water and Sewer Fees23-2417Water Meters:3 inch Meter C2$2,280.25
Public Works2.1Water and Sewer Fees23-2417Water Meters:3 Inch MeterT2$1,578.21
Public Works2.1Water and Sewer Fees23-2417Water Meters:3 inch T-2 Measuring Chamber Assembly $1,075.71
Public Works2.1Water and Sewer Fees23-2417Water Meters:3/4 inch meter$173.56
Public Works2.1Water and Sewer Fees23-2417Water Meters:3/4 inch meter (short)$173.56
Public Works2.1Water and Sewer Fees23-2417Water Meters:4 inch C-2 Measuring Chamber Assembly$1,630.38
Public Works2.1Water and Sewer Fees23-2417Water Meters:4 inch compound meter C2$4,110.86
Public Works2.1Water and Sewer Fees23-2417Water Meters:4 inch T-2 Measuring Chamber Assembly$1,139.68
Public Works2.1Water and Sewer Fees23-2417Water Meters:4 inch Turbo Meter (Irrigation) T2$3,318.46
Public Works2.1Water and Sewer Fees23-2417Water Meters:6 inch C-2 Measuring Chamber Assembly$3,011.46
Public Works2.1Water and Sewer Fees23-2417Water Meters:6 inch Compound Meter C2$6,840.72
Public Works2.1Water and Sewer Fees23-2417Water Meters:6 Inch Meter T2$5,531.39
Public Works2.1Water and Sewer Fees23-2417Water Meters:6 inch T-2 Measuring Chamber Assembly$1,910.90
Public Works2.1Water and Sewer Fees23-2417Water Meters:Backflow Assembly 1 1/2"$774.95
Public Works2.1Water and Sewer Fees23-2417Water Meters:Backflow Assembly 1"$420.90
Public Works2.1Water and Sewer Fees23-2417Water Meters:Backflow Assembly 2"$832.03
Public Works2.1Water and Sewer Fees23-2417Water Meters:Backflow Assembly 3/4"$411.67
Public Works2.1Water and Sewer Fees23-2417Water Meters:Backflow Assembly Repair Kit 1 1/2"$395.85
Public Works2.1Water and Sewer Fees23-2417Water Meters:Backflow Assembly Repair Kit 1"$248.15
Public Works2.1Water and Sewer Fees23-2417Water Meters:Backflow Assembly Repair Kit 2"$481.25
Public Works2.1Water and Sewer Fees23-2417Water Meters:Backflow Assembly Repair Kit 3/4"$160.65
Public Works2.1Water and Sewer Fees23-2417Water Meters:Backflow Test Port Valve$19.95
Public Works2.1Water and Sewer Fees23-2417Water Meters:Dual Port MXU (*b) (*b) Charge is half the cost of a dual MXU for dual meter installation in a single common meter vault. (Full replacement cost of a dual port MXU is $260.42)$130.21
Public Works2.1Water and Sewer Fees23-2417Water Meters:Hydrant Meter H2$1,751.30
Public Works2.1Water and Sewer Fees23-2417Water Meters:OMNI Hydrant Meter H2 Handle$36.07
Public Works2.1Water and Sewer Fees23-2417Water Meters:OMNI Hydrant Meter H2 Register w/Measuring Chamber, Complete$1,088.02
Public Works2.1Water and Sewer Fees23-2417Water Meters:Single Port MXU$223.44
Public Works2.1Water and Sewer Fees23-2403Water RateBase (administrative fee)$5.77
Public Works2.1Water and Sewer Fees23-2417Water RateUse Charge (Per 1000 gallons)$2.00
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:1 inch Angle Valve$137.13
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:1" FIP x FIP Brass Curb Stop Valve$117.91
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:1" Comp x 3/4" MIP U-Branch Brass$88.51
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:1" IP 250 PSI Poly Pipe Per linear Ft.$0.95
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:1" IP Compression x 3/4 MIP Brass Fitting$47.96
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:1" x 1" IP PE Compression x Compression Grip Coupler$67.58
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:1.5 " IP 250 PSI Poly Pipe Per linear Ft.$2.32
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:1.5 inch Angle Valve$332.82
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:1.5" FIP x FIP Brass Curb Stop Valve$241.43
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:1.5" x 1.5" IP PE Compression x Compression Grip Coupler$147.16
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:10" C-900 Pipe Per linear Ft.$36.08
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:10" Repair Coupler$576.11
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:10" Wedge Restraint Gland Pack$186.06
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:10" LPS (Long Pattern Sleeve)$220.14
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:12" C-900 Pipe Per linear Ft.$50.80
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:12" Repair Coupler$674.90
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:12" Repair Coupler LPS (Long Pattern Sleeve)$296.15
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:12" Wedge Restraint Gland Pack$195.20
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:2 inch Angle Valve$417.96
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:2 inch gate valve for hydrant meter$309.72
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:2" FIP x FIP Brass Curb Stop Valve$353.12
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:2" IP 250 PSI Poly Pipe Per linear Ft.$3.81
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:2" x 2" IP PE Compression x Compression Grip Coupler$198.28
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:3/4 FIP x FIP Brass Curb Stop Valve$75.90
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:3/4 inch angle valves$92.40
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:3/4" IP 250PSI Poly Pipe Per linear Ft.$0.60
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:3/4" Road Base Material - per yd w/delivery$22.32
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:3/4" x 3/4" IP PE Compression x Compression Grip Coupler$33.82
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:4" C-900 Pipe Per linear Ft.$6.87
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:4" Repair Coupler$270.14
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:4" Wedge Restraint Gland Pack$63.99
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:4" LPS (Long Pattern Sleeve)$68.34
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:6" C-900 Pipe Per linear Ft.$14.02
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:6" Repair Coupler$353.09
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:6" Wedge Restraint Gland Pack$79.08
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:6" LPS (Long Pattern Sleeve)$114.46
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:8" C-900 Pipe Per linear Ft.$24.05
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:8" Repair Coupler$442.74
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:8" Wedge Restraint Gland Pack$106.81
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:8" LPS (Long Pattern Sleeve)$183.98
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Adapter 3/4" MIP x HT$4.98
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Adapter 2 1/2" MNST x 2" MIP$81.38
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Bushing 1" x 3/4"$4.81
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Bushing 2" x 1" Brass$18.68
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Bushing 3" x 2" Brass$47.21
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Cast-Iron Valve Lid$20.73
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Equipment, Heavy Duty (per hour)$12.23
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Equipment, Light Duty (per hour)$6.01
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Fire Hydrant Assembly$3,713.13
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Grade Ring - Bottom 2"$35.36
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Grade Ring - Top 4"$42.53
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Hourly charge, water service call$44.44
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Hydrant - 6" Extension$787.28
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Hydrant Break-Away Kit$370.26
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Hydrant Meter 2.5 FHT Swivel / no screen$156.25
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Hydrant Meter 2.5 FHT Swivel and screen$282.69
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Hydrant Meter Gate Valve Handle 2"$39.06
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Hydrant meter, daily rental$5.00
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Lid Only - 24" Manhole Cover$165.85
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Manhole Ring$261.58
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Meter Setter 1 inch$593.37
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Meter Setter 1.5 inch$1,930.99
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Meter Setter 2 inch$2,187.79
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Meter Setter 3/4 inch$376.98
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Nipple 1 1/2" Close Brass$8.18
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Nipple 1" Close Brass$4.19
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Nipple 2" Close Brass$12.51
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Nipple 3/4" Close Brass$2.87
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Non-Traffic Meter Tub 36"$149.13
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Non-Traffic Rated 42" Meter Tub/Tile for Single/Double Services$220.83
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Non-Traffic Rated Standard Lid & Ring$188.79
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Padlock$9.00
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Residential Meter Lid and Ring$161.63
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Service Truck, Heavy Duty (per hour)$27.58
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Service Truck, Light Duty (per hour)$13.15
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Service Turn-on$30.00
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Silt Sand - per yard$30.28
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Sod sf ft$0.37
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:STORZ fitting - 4.5 hydrant nozzle$233.06
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Traffic Rated Lid 20"$52.35
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Traffic Rated Meter Tub 42"$40.05
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Traffic Rated Ring 20"$146.85
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Valve Box - 16" Top Section$44.10
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Valve Box - 26" Top Section$80.49
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Valve Box - 36" Bottom Section$76.05
Public Works2.1Water and Sewer Fees23-2417Water System Repair Fee:Valve Box Extension Riser 1-6"$60.19
Public Works2.2Commercial and Industrial Site Plan23-2417Development Plan Review3rd and Subsequent Reviews$100.00
Public Works2.2Commercial and Industrial Site Plan23-2417Development Plan ReviewInitial Review$378 + $10 per lot
Public Works2.2Commercial and Industrial Site Plan23-2417Drainage Plan Review < 1.5 acres3rd and Subsequent Reviews$24.00
Public Works2.2Commercial and Industrial Site Plan23-2417Drainage Plan Review < 1.5 acresInitial Review$48.00
Public Works2.2Commercial and Industrial Site Plan23-2417Drainage Plan Review > 20 acres3rd and Subsequent Reviews$96.00
Public Works2.2Commercial and Industrial Site Plan23-2417Drainage Plan Review > 20 acresInitial Review$192.00
Public Works2.2Commercial and Industrial Site Plan23-2417Drainage Plan Review 1.5 to 10 acres3rd and Subsequent Reviews$48.00
Public Works2.2Commercial and Industrial Site Plan23-2417Drainage Plan Review 1.5 to 10 acresInitial Review$96.00
Public Works2.2Commercial and Industrial Site Plan23-2417Drainage Plan Review 10 to 20 acres3rd and Subsequent Reviews$96.00
Public Works2.2Commercial and Industrial Site Plan23-2417Drainage Plan Review 10 to 20 acresInitial Review$192.00
Public Works2.2Commercial and Industrial Site Plan23-2417Floodplain Development Permit Review $25.00
Public Works2.2Commercial and Industrial Site Plan23-2417InspectionSewer Main Inspection$.69 per lineal foot
Public Works2.2Commercial and Industrial Site Plan23-2417InspectionWater Main Inspection$.69 per lineal foot
Public Works2.2Commercial and Industrial Site Plan23-2417Off-Site Water or Sewer Main Plan Review3rd and Subsequent Reviews$.20 per lineal foot
Public Works2.2Commercial and Industrial Site Plan23-2417Off-Site Water or Sewer Main Plan ReviewInitial Review$.40 per lineal foot
Public Works2.2Commercial and Industrial Site Plan23-2417Private Street Review $300 + $.10 per lineal foot (along street centerline)
Public Works2.2Commercial and Industrial Site Plan23-2417Sewage Lift Station InspectionSewage Lift Station Inspection$576.00
Public Works2.2Commercial and Industrial Site Plan23-2417Sewage Lift Station Review $492.00
Public Works2.2Commercial and Industrial Site Plan23-2417Utility Plan Review with new public water or sewer mains3rd and Subsequent Reviews$144 +$.20 per lineal foot
Public Works2.2Commercial and Industrial Site Plan23-2417Utility Plan Review with new public water or sewer mainsInitial Review$288 +$.40 per lineal foot
Public Works2.2Commercial and Industrial Site Plan23-2417Utility Plan Review with no new water or sewer mains (services existing)3rd and Subsequent Reviews$48.00
Public Works2.2Commercial and Industrial Site Plan23-2417Utility Plan Review with no new water or sewer mains (services existing)Initial Review$96.00
Public Works2.2Commercial and Industrial Site Plan23-2417Utility Plan Review with no new water or sewer mains (services not existing)3rd and Subsequent Reviews$72.00
Public Works2.2Commercial and Industrial Site Plan23-2417Utility Plan Review with no new water or sewer mains (services not existing)Initial Review$144.00
Public Works2.2Commercial and Industrial Site Plan23-2417Water and Sewer InspectionNo new water or sewer mains$72.00
Public Works2.3Environmental Division Fees23-2417Pretreatment Plan ReviewNew Commercial Construction$75.00
Public Works2.3Environmental Division Fees23-2417Pretreatment Plan ReviewTenant Improvement$75.00
Public Works2.3Environmental Division Fees23-2417Pretreatment Plan Site InspectionNew Commercial Construction$75.00
Public Works2.3Environmental Division Fees23-2417Pretreatment Plan Site InspectionTenant Improvement$75.00
Utility Billing3.1Solid Waste Collection23-2408Commercial Temporary Service3 yd (Daily Rent)1.03
Utility Billing3.1Solid Waste Collection23-2408Commercial Temporary Service3 yd (Monthly Rent)31.12
Utility Billing3.1Solid Waste Collection23-2408Commercial Temporary Service3 yd Haul Svc (Construction and Demolition)138.91
Utility Billing3.1Solid Waste Collection23-2408Commercial Temporary Service3 yd Haul Svc (Municipal Solid Waste)51.54
Utility Billing3.1Solid Waste Collection23-2408Commercial Carts1, 95 gallon cart (1 x per week)37.44
Utility Billing3.1Solid Waste Collection23-2408Commercial Carts1, 95 gallon cart (2 x per week)70.8
Utility Billing3.1Solid Waste Collection23-2408Commercial Carts1, 95 gallon cart (3 x per week)104.14
Utility Billing3.1Solid Waste Collection23-2408Commercial Carts2, 95 gallon cart (1 x per week)74.93
Utility Billing3.1Solid Waste Collection23-2408Commercial Carts2, 95 gallon cart (2 x per week)141.64
Utility Billing3.1Solid Waste Collection23-2408Commercial Carts2, 95 gallon cart (3 x per week)208.28
Utility Billing3.1Solid Waste Collection23-2408Commercial Carts3, 95 gallon cart (1 x per week)112.4
Utility Billing3.1Solid Waste Collection23-2408Commercial Carts3, 95 gallon cart (2 x per week)212.47
Utility Billing3.1Solid Waste Collection23-2408Commercial Carts3, 95 gallon cart (3 x per week)312.43
Utility Billing3.1Solid Waste Collection23-2408Commercial CartsDelivery Charge12.98
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection3 yd (1 x week)78.67
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection3 yd (2 x week)138.9
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection3 yd (3 x week)199.16
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection3 yd (4 x week)259.4
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection3 yd (5 x week)319.63
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection3 yd (Every Other Week)62.76
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection3 yd (Extra Dump)21.42
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection5 yd (1 x week)119.93
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection5 yd (2 x week)201.64
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection5 yd (3 x week)282.8
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection5 yd (4 x week)364.22
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection5 yd (5 x week)445.64
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection5 yd (Every Other Week)86.35
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection5 yd (Extra Dump)29.17
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection6 yd (1 x week)127.5
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection6 yd (2 x week)228.04
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection6 yd (3 x week)328.56
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection6 yd (4 x week)429.11
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection6 yd (5 x week)529.67
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection6 yd (Every Other Week)102.39
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection6 yd (Extra Dump)35.46
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection8 yd (1 x week)152.49
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection8 yd (2 x week)277.64
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection8 yd (3 x week)402.79
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection8 yd (4 x week)527.99
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection8 yd (5 x week)655.39
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection8 yd (Every Other Week)121.59
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection8 yd (Extra Dump)48.45
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection95 gallon carts (1 cart/week)16.46
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection95 gallon carts (2 cart/week)26.14
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection95 gallon carts (3 cart/week)35.82
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection95 gallon carts (4 cart/week)45.51
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable Collection95 gallon carts (5 cart/week)55.18
Utility Billing3.1Solid Waste Collection23-2408Commercial Commingled Recyclable CollectionContainer Delivery Charge (3,5,6,8 yd options)29.6
Utility Billing3.1Solid Waste Collection23-2408Commercial Compactors2 yd (base price per pickup per week)73.67
Utility Billing3.1Solid Waste Collection23-2408Commercial Compactors3 yd (base price per pickup per week)101.97
Utility Billing3.1Solid Waste Collection23-2408Commercial Compactors4 yd (base price per pickup per week)130.78
Utility Billing3.1Solid Waste Collection23-2408Commercial Compactors5 yd (base price per pickup per week)159.64
Utility Billing3.1Solid Waste Collection23-2408Commercial Compactors6 yd (base price per pickup per week)187.75
Utility Billing3.1Solid Waste Collection23-2408Commercial Compactors8 yd (base price per pickup per week)252.08
Utility Billing3.1Solid Waste Collection23-2408Commercial Container2 yd (Extra Dump)30.41
Utility Billing3.1Solid Waste Collection23-2408Commercial Container3 yd (Extra Dump)41.4
Utility Billing3.1Solid Waste Collection23-2408Commercial Container6 yd (Extra Dump)60.15
Utility Billing3.1Solid Waste Collection23-2408Commercial Container8 yd (Extra Dump)77.38
Utility Billing3.1Solid Waste Collection23-2408Commercial ContainerContainer Delivery Svc (2,3,6,8 vd options)29.6
Utility Billing3.1Solid Waste Collection23-2408Commercial ContainerExtra Yard (Overload Each yd)19.27
Utility Billing3.1Solid Waste Collection23-2408Commercial ContainerLid Lock Installation (2,3,6,8 yd options)55.75
Utility Billing3.1Solid Waste Collection23-2408Commercial ContainerMonthly Lock Service (2,3,6,8 yd options)16.07
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers2 vd (6 x per week)464.46
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers2 yd (2x per week)177.36
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers2 yd (3x per week)229.53
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers2 yd (4x per week)307.93
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers2 yd (5 x per week)386.17
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers2 yd (lx per week)124.26
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers3 yd (2 x per week)209.08
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers3 yd (3 x per week)289.09
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers3 yd (4 x per week)380.88
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers3 yd (5 x per week)500.87
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers3 yd (6 x per week)606.79
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers3 yd (lx per week)129.21
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers6 yd (1 x per week)201.36
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers6 yd (2 x per week)324.84
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers6 yd (3 x per week)448.2
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers6 yd (4 x per week)597.64
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers6 yd (5 x per week)747.15
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers6 yd (6 x per week)896.58
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers8 yd (1 x per week)238.89
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers8 yd (2 x per week)370.95
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers8 yd (3 x per week)501.55
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers8 yd (4 x per week)648.86
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers8 yd (5 x per week)805.74
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers8 yd (6 x per week)955.67
Utility Billing3.1Solid Waste Collection23-2408Commercial Containers8 yd (7 x per week)1460.23
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion10 yd Disposal Fee (Wood)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion10 yd Disposal Fee (Clean Rock, Gravel, etc.)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion10 yd Disposal Fee (Sheetrock)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion20 - 40 yd Wood, Sheetrock, Clean Rock167.34
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion20 yd Disposal Fee (Wood)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion40 yd Disposal Fee (Clean Rock, Gravel, etc.)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion40 yd Disposal Fee (Sheetrock)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion6 - 8 yd containers (Haul Svc)73.95
Utility Billing3.1Solid Waste Collection23-2408Industrial DiversionContainer Delivery Svc 20 - 40 yd29.92
Utility Billing3.1Solid Waste Collection23-2408Industrial DiversionContainer Delivery Svc 6 - 10 yd29.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling15 - 40 yd Compactors (Haul Svc)167.34
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling40 vd (Monthly Rent)153.41
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling40 yd (Daily Rent)5.04
Utility Billing3.1Solid Waste Collection23-2408Industrial & Commercial ServicesDry Run - Industrial & commercial containers, compactors127.49
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion20 yd Disposal Fee (Clean Rock, Gravel, etc.)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion20 yd Disposal Fee (Sheetrock)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion30 yd Disposal Fee (Clean Rock, Gravel, etc.)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion30 yd Disposal Fee (Sheetrock)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion30 yd Disposal Fee (Wood)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion40 yd Disposal Fee (Wood)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion6 yd Disposal Fee (Clean Rock, Gravel, etc.)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion6 yd Disposal Fee (Sheetrock)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion6 yd Disposal Fee (Wood)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion8 yd Disposal Fee (Clean Rock, Gravel, etc.)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion8 yd Disposal Fee (Sheetrock)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Diversion8 yd Disposal Fee (Wood)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling10 yd (Daily Rent)3.16
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling10 yd (Monthly Rent)95.53
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling20 yd (Daily Rent)3.61
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling20 yd (Monthly Rent)109.84
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling20- 40 yd containers (Haul Svc)167.34
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling30 yd (Daily Rent)4.41
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling30 yd (Monthly Rent)134.24
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling6 - 10 yd containers (Haul Svc)73.94
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling6 yd (Daily Rent)2.18
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling6 yd (Monthly Rent)66.13
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling8 yd (Monthly Rent)85.72
Utility Billing3.1Solid Waste Collection23-2408Industrial Recycling8yd (Daily Rent)2.82
Utility Billing3.1Solid Waste Collection23-2408Industrial RecyclingContain Deliver Svc 20 -40 vd29.92
Utility Billing3.1Solid Waste Collection23-2408Industrial RecyclingContainer Delivery Svc 6 - 10 yd29.92
Utility Billing3.1Solid Waste Collection23-2408Industrial RecyclingProcessing per compact yard (as applicable)2.52
Utility Billing3.1Solid Waste Collection23-2408Industrial RecyclingProcessing per loose yard (as applicable)1.26
Utility Billing3.1Solid Waste Collection23-2408Industrial ServicesTurnaround compactor fee - Commercial/Industrial20.99
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash10 yd (Daily Rent)3.13
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash10 yd (Monthly Rent)95.53
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash10 yd Disposal Fee (C&D/Compacted)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash10 yd Disposal Fee (Municipal Solid Waste)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash20 - 40 yd containers (Certification fee Asbestos - Ada County)25.73
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash20 - 40 yd containers (Haul Svc for Asbestos - Idaho Waste Systems)376.33
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash20 - 40 yd containers (Haul Svc for Asbestos - Ada County)376.33
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash20 - 40 yd containers (Haul Svc)433.58
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash20 yd (Monthly Rent)109.84
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash20 yd Disposal Fee (Asbestos - Ada County Landfill)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash20 yd Disposal Fee (C&D/Compacted)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash20 yd Disposal Fee (Asbestos - Idaho Waste Systems)882.76
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash20 yd Disposal Fee (Municipal Solid Waste)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash20yd (Daily Rent)3.61
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash20yd compactor Disposal Fee33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash25vd compactor Disposal Fee33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash30 yd (Daily Rent)4.41
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash30 yd (Monthly Rent)134.24
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash30 yd Disposal Fee (Asbestos - Ada County Landfill)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash30 yd Disposal Fee (Asbestos - Idaho Waste Systems)1324.14
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash30 yd Disposal Fee (C&D/Compacted)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash30 yd Disposal Fee (Municipal Solid Waste)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash30yd compactor Disposal Fee33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash40 yd (Daily Rent)5.04
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash40 yd (Monthly Rent)153.41
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash40 yd Disposal Fee (Asbestos - Ada County Landfill)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash40 yd disposal Fee (Asbestos - Idaho Waste Systems)1765.52
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash40 yd Disposal Fee (C&D/Compacted)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash40 yd Disposal Fee (Municipal Solid Waste)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash40yd compactor Disposal Fee33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash6 - 10 yd containers (Haul Svc)133.5
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash6 yd (Daily Rent)2.18
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash6 yd (Monthly Rent)66.13
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash6 yd Disposal Fee (C&D/Compacted)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash6 yd Disposal Fee (Municipal Solid Waste)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash8 yd (Daily Rent)2.82
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash8 yd (Monthly Rent)85.72
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash8 yd Disposal Fee (C&D/Compacted)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash8 yd Disposal Fee (Municipal Solid Waste)33.92
Utility Billing3.1Solid Waste Collection23-2408Industrial TrashContainer Delivery Svc 20 - 40 vd29.92
Utility Billing3.1Solid Waste Collection23-2408Industrial TrashContainer Delivery Svc 6 - 10 yd29.92
Utility Billing3.1Solid Waste Collection23-2408Industrial Trash/Diversion/Recycling20 - 40 yd screen lid48.09
Utility Billing3.1Solid Waste Collection23-2408Miscellaneous CollectionBulky Item Pickup (per item)19.45
Utility Billing3.1Solid Waste Collection23-2408Miscellaneous CollectionCommercial Combo Lock Replacement35.68
Utility Billing3.1Solid Waste Collection23-2408Miscellaneous CollectionExtra Pickup/Go Back (per occurrence)13.85
Utility Billing3.1Solid Waste Collection23-2408Miscellaneous CollectionFreon-containing units/appliances68.59
Utility Billing3.1Solid Waste Collection23-2408Miscellaneous CollectionNon-Freon units/appliances19.45
Utility Billing3.1Solid Waste Collection23-2408Miscellaneous CollectionPressure Wash - Industrial250.42
Utility Billing3.1Solid Waste Collection23-2408Miscellaneous CollectionRelocation (all sizes) - Commercial/Industrial29.92
Utility Billing3.1Solid Waste Collection23-2408Miscellaneous CollectionSpecial Collection (for each increment of 10 minutes)27.49
Utility Billing3.1Solid Waste Collection23-2408Miscellaneous CollectionTires 9 (ea.) up to 16 inch7.2
Utility Billing3.1Solid Waste Collection23-2408Miscellaneous CollectionWeekend Charge - Industrial84.94
Utility Billing3.1Solid Waste Collection23-2408Residential48 gallon service (includes l recycling cart)19.11
Utility Billing3.1Solid Waste Collection23-2408Residential65 gallon service (includes l recycling cart)21.68
Utility Billing3.1Solid Waste Collection23-2408Residential95 gallon service (includes l recycling cart)24.27
Utility Billing3.1Solid Waste Collection23-2408ResidentialCarry Out Service40.69
Utility Billing3.1Solid Waste Collection23-2408ResidentialCart Delivery (free)0
Utility Billing3.1Solid Waste Collection23-2408ResidentialCart Pickup/ Upsize Exchange fee (per event)17.28
Utility Billing3.1Solid Waste Collection23-2408ResidentialExtra Carts (per cart per month)2.9
Fire4.1Fire Fees19-2164Above Ground Storage Tank Operational PermitAbove Ground Storage Tank Operational Permit$85
Fire4.1Fire Fees19-2148Compliance Engine Administrative FeeAdministration fee for the compliance engine inspection contract$13.05
Fire4.1Fire Fees19-2164False Alarm (2nd Offense)Second False Alarm within Calendar Year (2nd Offense)$65
Fire4.1Fire Fees19-2164False Alarm (3rd Offense)Third False Alarm within Calendar Year (3rd Offense)$130
Fire4.1Fire Fees19-2164False Alarm (4th Offense)Fourth False Alarm within Calendar Year (4th Offense)$195
Fire4.1Fire Fees19-2164False Alarm (5th Offense)Fifth False Alarm within Calendar Year (5th and beyond)$260
Fire4.1Fire Fees19-2167Fire Operational FeesBrush/Squad Per hour$180.57
Fire4.1Fire Fees19-2167Fire Operational FeesCommand/Incident Mang. Per Hour$54.75
Fire4.1Fire Fees18-2110Fire Operational FeesDay Care Inspections$25
Fire4.1Fire Fees18-2110Fire Operational FeesEMT Bike Patrol 2 Person Team (4 hrs Minimum, $60/hr)$480
Fire4.1Fire Fees18-2110Fire Operational FeesEMT Bike Patrol 4 Person Team (4 hrs Minimum, $60/hr)$960
Fire4.1Fire Fees19-2167Fire Operational FeesEngine Response Per Hour$261.29
Fire4.1Fire Fees19-2164Fire Operational FeesInspector/Investigator Per Hour (Firework Display Inspection)$65
Fire4.1Fire Fees19-2167Fire Operational FeesTender Response Per Hour$190.80
Fire4.1Fire Fees20-2230Mobile Food Vendor InspectionAny mobile food vendors that cook – will be required to have a fire department inspection annually$45
Fire4.1Fire Fees18-2110Residential & Commercial Subdivisions*Preliminary Plat (per each lot) *Projects being processed as Planned Developments will be exempt from the Preliminary Plat FeesSee Planning Section 1.6
Fire4.1Fire Fees18-2110Residential & Commercial SubdivisionsAnnexation & Zoning ApplicationSee Planning Section 1.6
Fire4.1Fire Fees18-2110Residential & Commercial SubdivisionsConditional Use PermitSee Planning Section 1.6
Fire4.1Fire Fees18-2110Residential & Commercial SubdivisionsFinal PlatSee Planning Section 1.6
Fire4.1Fire Fees18-2110Residential & Commercial SubdivisionsPlanned DevelopmentSee Planning Section 1.6
Police4.2Police Fees18-2110Extra-Duty Personnel - Officer $54.01
Police4.2Police Fees18-2110Extra-Duty Personnel - Supervisor $60.32
Police4.2Police Fees18-2110False AlarmFifth False Alarm within Calendar Year$75
Police4.2Police Fees18-2110False AlarmFourth False Alarm within Calendar Year$50
Police4.2Police Fees18-2110False AlarmSixth or subsequent w/in Calendar yr$100
Police4.2Police Fees18-2110False AlarmThird False Alarm within Calendar Year$25
Police4.2Police Fees22-2343Impound fee – catFee to impound a Meridian cat at the IHS facility.$15.00
Police4.2Police Fees22-2343Impound fee – DogCost ofg services necessary to capture a dog at large in Meridian and impound it at the HIS facility.$50.00
Police4.2Police Fees22-2343Impound fee – livestockFee to impound Meridian livestock at the IHS facility.$150.00
Police4.2Police Fees22-2343Impound fee – vicious dog or bite caseFee to impound a Meridian dog at the IHS facility, where the dog has bitten a person, and/or is reported to be vicious. $75.00
Police4.2Police Fees18-2110Labor to make paper copies of public records(applies if records are redacted, more than 100 pages, or more than 2 hours; waived if total is less than $10.00)$24.67/hour $.41/minute
Police4.2Police Fees18-2110Labor to redact exempt public records $47.70/hour $.80/minute
Police4.2Police Fees18-2110Labor to upload public record information to CD, DVD, or thumb drive $24.67/hour $.41/minute
Police4.2Police Fees18-2110Nuisance/weeds abatement administrative fee $100
Police4.2Police Fees18-2110Paper copies of public records (applies if records are redacted, more than 100 pages, or more than 2 hours; waived if total is less than $10.00)$0.10/page
Police4.2Police Fees18-2110Parking TicketsA. Sections 7-2-2, 7-2-3, 7-2-7$15
Police4.2Police Fees18-2110Parking TicketsB. Sections 7-2-4, 7-2-5$35
Police4.2Police Fees18-2110Parking TicketsC. Sections 7-2-6, 7-2-8$50
Police4.2Police Fees18-2110Parking TicketsD. Sections 7-2-9$100
Police4.2Police Fees18-2110Parking TicketsLate Payment penalty$10
Police4.2Police Fees18-2110Thumb drive with public record information $7.50 ea
Clerks4.3City Clerks Fees18-2110Alcohol catering permitAlcohol Permit$20
Clerks4.3City Clerks Fees18-2110Attorney Labor to redact nonpublic recordsHours 1 & 2 Bound by I.C. 74-102(10)Free
Clerks4.3City Clerks Fees18-2110Attorney Labor to redact nonpublic recordsHours 3 & up Bound by I.C. 74-102(10)$60 /hr
Clerks4.3City Clerks Fees18-2110Beer Licenseby the drink$200
Clerks4.3City Clerks Fees18-2110Beer Licenseretail$50
Clerks4.3City Clerks Fees21-2288Campaign Filing FeeFee to file declaration of candidacy for elective City office per Idaho Code section 50.406$40.00
Clerks4.3City Clerks Fees18-2110Dairy Days Art Show Vendor Fee $20
Clerks4.3City Clerks Fees18-2110Dog License FeesNeutered$16
Clerks4.3City Clerks Fees18-2110Dog License FeesNon-neutered$21
Clerks4.3City Clerks Fees18-2110Dog License FeesReplacement Tag$5
Clerks4.3City Clerks Fees18-2110Fireworks Display Permit $125
Clerks4.3City Clerks Fees18-2110Liquor Licenseby the drink$562.50
Clerks4.3City Clerks Fees18-2110Liquor/beer/wine license transfer $100
Clerks4.3City Clerks Fees18-2119Mobile sales unit license(includes $33.25 ISP background check fee)$73.25
Clerks4.3City Clerks Fees18-2110Other labor to respond to public records requestHours 1 & 2Free
Clerks4.3City Clerks Fees18-2110Other labor to respond to public records requestHours 3 & up$30.00/hr
Clerks4.3City Clerks Fees18-2110Paper copies of public record information0 - 100 pagesFree
Clerks4.3City Clerks Fees18-2110Paper copies of public record information101 or more pages$0.10/page
Clerks4.3City Clerks Fees18-2110Passport FeeMandatory by Federal agency$35
Clerks4.3City Clerks Fees18-2119Pawnbroker's license with Precious Metal Dealer Endorsement - New(includes $33.25 ISP background check fee)$63.25
Clerks4.3City Clerks Fees18-2110Pawnbroker's license with Precious Metal Dealer Endorsement - Renewal $30
Clerks4.3City Clerks Fees18-2119Pawnbroker's license without Precious Metal Dealer Endorsement - New(includes $33.25 ISP background check fee)$63.25
Clerks4.3City Clerks Fees18-2110Pawnbroker's license without Precious Metal Dealer Endorsement - Renewal $30
Clerks4.3City Clerks Fees18-2119Precious Metal Dealer License - New(includes $33.25 ISP background check fee)$63.25
Clerks4.3City Clerks Fees18-2110Precious Metal Dealer License - Renewal $30
Clerks4.3City Clerks Fees18-2110Retail Sales of Non-Aerial Common Fireworks Permit $25
Clerks4.3City Clerks Fees18-2110Returned Item FeeReturned Item created by check, in-person withdrawal, ACH or other electronic means$20
Clerks4.3City Clerks Fees18-2110Temporary use permitLarge-scale Special Event$150
Clerks4.3City Clerks Fees18-2110Temporary use permitOutdoor Market (in a park)$85
Clerks4.3City Clerks Fees18-2110Temporary use permitOutdoor Market (not in a park)$50
Clerks4.3City Clerks Fees18-2110Temporary use permitPromotional Sales Unit$65
Clerks4.3City Clerks Fees18-2110Temporary use permitSpecial Event (in a park)$85
Clerks4.3City Clerks Fees18-2110Temporary use permitSpecial Event (not in a park)$50
Clerks4.3City Clerks Fees18-2110Temporary use permitSubdivision Model Home or Subdivision Real Estate Sales Office$65
Clerks4.3City Clerks Fees18-2110Temporary use permitTemporary Sales Unit$65
Clerks4.3City Clerks Fees19-2137Vehicle Immobilization License Application Fee(includes $33.25 ISP background check fee)$73.25
Clerks4.3City Clerks Fees18-2110Wine Licenseby the drink$200
Clerks4.3City Clerks Fees18-2110Wine Licenseretail$200
Mayor's Office4.4Other Administrative Fees18-2110State of the City Individual AdmissionState of the City Admission$10
Other Government4.4Other Administrative Fees18-2110Initial Point Gallery Maintenance fee $35
Parks4.5Parks Fees22-2319Community PoolOpen Swim or Lap Swim - 3 and Under- $1.89 plus tax = $2.00$2
Parks4.5Parks Fees22-2319Community PoolOpen Swim or Lap Swim - Adult (18+) - $3.77 plus tax $4,00$4
Parks4.5Parks Fees22-2319Community PoolOpen Swim or Lap Swim - Ages 4 - 17 - $2.83 plus tax = $3.00$3
Parks4.5Parks Fees22-2319Community PoolPrivate Party - 1-50 people - $141.51 plus tax = $150/hour$150/ hour
Parks4.5Parks Fees22-2319Community PoolPrivate Party - 100-150 people - $283.02 plus tax = $300.00/ hour$300/ hour
Parks4.5Parks Fees22-2319Community PoolPrivate Party - 50-100 people - $188.68 plus tax = $200/ hour$200/ hour
Parks4.5Parks Fees22-2319Community PoolPrivate Party - Party Room (30 people max) - $47.17 plus tax = $50/ hour$50/ hour
Parks4.5Parks Fees23-2377Community PoolSeason Pass - Family$160
Parks4.5Parks Fees23-2377Community PoolSeason Pass - Individual$45
Parks4.5Parks Fees22-2319Community PoolSwim Lessons - Group Lesson - $42.45 plus tax = $45/child$45
Parks4.5Parks Fees23-2377Community PoolSwim Lessons - Private Lesson$140
Parks4.5Parks Fees23-2377Community PoolSwim Lessons - Semi-Private Lesson190
Parks4.5Parks Fees22-2319Community PoolSwim Team - Practice - Lifeguards' hourly rateLifeguards' hourly rate
Parks4.5Parks Fees22-2319Community PoolSwim Team - Swim Meet - $1,132.07 plus tax = $1,200/meet$1,200/ meet
Parks4.5Parks Fees19-2134Discovery ParkEntire Special Event Area (Includes Green, Red, and Blue Shelters, stage, and grass area)$350
Parks4.5Parks Fees19-2134Discovery ParkStage and Grass Area$100
Parks4.5Parks Fees18-2110General Park FeesAmplified Sound Permit (per day)$20
Parks4.5Parks Fees18-2110General Park FeesAmus. Equip./Lrg Canopies (each, per day) $10
Parks4.5Parks Fees23-2424General Park FeesBallfield Prep Closet (per day, per site)$50
Parks4.5Parks Fees23-2424General Park FeesBallfield Temporary Fencing (per field, per day)$50
Parks4.5Parks Fees18-2110General Park FeesBaseball Field Lights (per hour)$25
Parks4.5Parks Fees18-2110General Park FeesBaseball/Softball Field Prep (per field)$12.50
Parks4.5Parks Fees18-2110General Park FeesBaseball/Softball Field Rental (per day)$75
Parks4.5Parks Fees18-2110General Park FeesBaseball/Softball Field Rental (per hour)$10
Parks4.5Parks Fees19-2134General Park FeesCancellation Fee$5
Parks4.5Parks Fees18-2110General Park FeesFull-Size Tennis/Quick Start/Pickball Court Rental - Pros (per hour)$8
Parks4.5Parks Fees18-2110General Park FeesMPR On-Site Event Staff (per hour)$20
Parks4.5Parks Fees18-2110General Park FeesMulti-Use Fiend Rental (per day)$75
Parks4.5Parks Fees18-2110General Park FeesMulti-Use Fiend Rental (per hour)$10
Parks4.5Parks Fees18-2110General Park FeesOutdoor Basketball Court Rental (per day)$75
Parks4.5Parks Fees18-2110General Park FeesOutdoor Basketball Court Rental (per hour)$10
Parks4.5Parks Fees18-2110General Park FeesShort Term Concessions Permit (annual)$100
Parks4.5Parks Fees18-2110General Park FeesShort Term Concessions Permit (per day)$10
Parks4.5Parks Fees18-2110General Park FeesSoftball Field Lights (per hour)$15
Parks4.5Parks Fees24-2424General Park FeesTennis/Pickball Courts Hourly Reservation$4.72
Parks4.5Parks Fees18-2110General Sports FeesFall Adult Softball USA Softball Fee$18
Parks4.5Parks Fees20-2236General Sports FeesMeridian Resident Fee$9.43
Parks4.5Parks Fees20-2236General Sports FeesNon-Meridian Resident Fee$18.87
Parks4.5Parks Fees19-2172General Sports FeesPickleballs - 1/2 dozen$14.99
Parks4.5Parks Fees18-2110General Sports FeesSpring Adult Softball USA Softball Fee$32
Parks4.5Parks Fees18-2110General Sports FeesUsed Softballs (each)$1
Parks4.5Parks Fees20-2236General Sports FeesUSSSA Team Sports Fee$25
Parks4.5Parks Fees19-2134Generations PlazaReflecting Wall Brick Paver$100
Parks4.5Parks Fees18-2110Generations PlazaStage and Grass Area Rental (full day)$75
Parks4.5Parks Fees18-2110Generations PlazaStage and Grass Area Rental (per hour)$10
Parks4.5Parks Fees18-2110Heroes ParkEntire Park Full Day (includes Shelter and Multi-Use fields)$300
Parks4.5Parks Fees18-2110Homecourt (court rental)1 Court (per hour)$42.45
Parks4.5Parks Fees18-2110Homecourt (court rental)1/2 Court (per hour)$21.23
Parks4.5Parks Fees18-2110Homecourt (court rental)2 Courts (per hour)$75.47
Parks4.5Parks Fees18-2110Homecourt (court rental)200 hours reserved during a calender year. Hours reserved must be paid up front and are non-refundable.10% Discount
Parks4.5Parks Fees18-2110Homecourt (court rental)3 Courts (per hour)$103.77
Parks4.5Parks Fees18-2110Homecourt (court rental)4 Courts (per hour)$122.64
Parks4.5Parks Fees18-2110Homecourt (court rental)500 hours reserved during a calender year. Hours reserved must be paid up front and are non-refundable.20% Discount
Parks4.5Parks Fees18-2110Homecourt (membership)Homecourt Membership - Meridian Resident, Adult (18-54 years of age)$20
Parks4.5Parks Fees18-2110Homecourt (membership)Homecourt Membership - Meridian Resident, Senior (55 or more years of age)$15
Parks4.5Parks Fees18-2110Homecourt (membership)Homecourt Membership - Meridian Resident, Youth (17 years of age and under)$15
Parks4.5Parks Fees18-2110Homecourt (membership)Homecourt Membership - Non-Meridian Resident$25
Parks4.5Parks Fees18-2110Homecourt (Open Gym)All Non-Residents$4 per day
Parks4.5Parks Fees18-2110Homecourt (Open Gym)Meridian Resident Adult (18 - 54 years of age)$3 per day
Parks4.5Parks Fees18-2110Homecourt (Open Gym)Meridian Resident Seniors (55 + years of age)$2 per day
Parks4.5Parks Fees18-2110Homecourt (Open Gym)Meridian Resident Youth 17 years of age and under$2 per day
Parks4.5Parks Fees18-2110JMK Memorial ParkBandshell (Up to 500 people)$150
Parks4.5Parks Fees18-2110JMK Memorial ParkBandshell with Shelters as needed (500+ people)$250
Parks4.5Parks Fees18-2110JMK Memorial ParkKleiner Memorial Plaza 4"x8" paver- independent installation$250
Parks4.5Parks Fees18-2110JMK Memorial ParkKleiner Memorial Plaza 4"x8" paver- normal installation schedule$150
Parks4.5Parks Fees18-2110JMK Memorial ParkKleiner Memorial Plaza 8"x8" paver- independent installation$350
Parks4.5Parks Fees18-2110JMK Memorial ParkKleiner Memorial Plaza 8"x8" paver- normal installation schedule$250
Parks4.5Parks Fees18-2110JMK Memorial ParkShelter A-1 and B-1 BBQ Grills$50
Parks4.5Parks Fees18-2110JMK Memorial ParkSpecial Event Full Day (full park)$1,500
Parks4.5Parks Fees18-2110JMK Memorial ParkSpecial Event Full Day (Includes Shelter A1 and grass area)$500
Parks4.5Parks Fees18-2110JMK Memorial ParkSpecial Event Half Day (full Park)$750
Parks4.5Parks Fees18-2110JMK Memorial ParkSpecial Event Half Day (Includes Shelter A1 and grass area)$250
Parks4.5Parks Fees18-2110Picnic Shelter Reservation Fees8th Street Park Shelter$40
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesBear Creek Park Shelter$50
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesCentennial Park Shelter$40
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesChampion Park Shelter$40
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesChateau Park Shelter$40
Parks4.5Parks Fees19-2134Picnic Shelter Reservation FeesDiscovery Park Blue Shelter$75
Parks4.5Parks Fees19-2134Picnic Shelter Reservation FeesDiscovery Park Green Shelter$125
Parks4.5Parks Fees19-2134Picnic Shelter Reservation FeesDiscovery Park Red Shelter$90
Parks4.5Parks Fees18-2118Picnic Shelter Reservation FeesFuller Park Shelter #1$50
Parks4.5Parks Fees18-2118Picnic Shelter Reservation FeesFuller Park Shelter #2$50
Parks4.5Parks Fees18-2118Picnic Shelter Reservation FeesFuller Park Shelter #3$40
Parks4.5Parks Fees18-2118Picnic Shelter Reservation FeesFuller Park Shelter #4$40
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesGordon Harris Park Shelter$40
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesHeroes Park Shelter$50
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesHillsdale Park Shelter #1$50
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesHillsdale Park Shelter #2$40
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesKeith Bird Legacy Park Shelter$40
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesKleiner Park Shelter A1$150
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesKleiner Park Shelter A2$75
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesKleiner Park Shelter A3$50
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesKleiner Park Shelter A4$50
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesKleiner Park Shelter B1$125
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesRenaissance Park Shelter$40
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesReta Huskey Park Shelter$40
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesSeasons Park Shelter$40
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesSettlers Park Shelter #1$75
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesSettlers Park Shelter #2$60
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesSettlers Park Shelter #3$50
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesStorey Park Blue Shelter$50
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesStorey Park Green Shelter$40
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesTully Park Large Shelter$75
Parks4.5Parks Fees18-2110Picnic Shelter Reservation FeesTully Park Small Shelter$40
Parks4.5Parks Fees18-2110Settlers ParkEast Half Full Day (includes Shelter #1 and Multi-Use fields)$300
Parks4.5Parks Fees18-2110Settlers ParkEast Half Full Day (includes Shelter #1, #2, #3 and fields)$400
Parks4.5Parks Fees18-2110Settlers ParkFull Day Tournament Fee (all courts)$200
Parks4.5Parks Fees18-2110Special EventsCommercial Entry Fee$100
Parks4.5Parks Fees18-2110Special EventsNon-Commercial Entry Fee$50
Parks4.5Parks Fees20-2192Sports League Team Fees3 v 3 Summer Basketball League$50
Parks4.5Parks Fees20-2236Sports League Team Fees3v3 Basketball- 7wk & SE$47.17
Parks4.5Parks Fees20-2236Sports League Team Fees4 v 4 Volleyball$47.74
Parks4.5Parks Fees20-2236Sports League Team Fees5v5 Basketball- 8wk$471.70
Parks4.5Parks Fees21-2287Sports League Team Fees5v5 Basketball- 8wk & DE$551.89
Parks4.5Parks Fees18-2110Sports League Team FeesFall Basketball$485.85
Parks4.5Parks Fees20-2236Sports League Team FeesFall Softball League$353.77
Parks4.5Parks Fees21-2287Sports League Team FeesFall Volleyball League$297.17
Parks4.5Parks Fees20-2217Sports League Team FeesFlag Football League$400.94
Parks4.5Parks Fees18-2110Sports League Team FeesIndoor Pickleball League$18.87
Parks4.5Parks Fees20-2236Sports League Team FeesKickball League - 8 wk$141.51
Parks4.5Parks Fees20-2192Sports League Team FeesMen's & Coed Summer/Fall Softball League$300
Parks4.5Parks Fees20-2217Sports League Team FeesSoftball 5 Week League$212.26
Parks4.5Parks Fees19-2172Sports League Team FeesSpring Basketball$350
Parks4.5Parks Fees20-2236Sports League Team FeesSpring Softball League$471.70
Parks4.5Parks Fees21-2287Sports League Team FeesSpring Volleyball League$259.43
Parks4.5Parks Fees18-2110Sports League Team FeesWinter Basketball$485.85
Parks4.5Parks Fees21-2287Sports League Team FeesWinter Volleyball League$297.17
Parks4.5Parks Fees20-2217Sports League Team FeesYouth Fast Pitch Softball League$448.11
Parks4.5Parks Fees18-2110Storey ParkNW Area Full Day (includes Blue Shelter & grass area)$200
Parks4.5Parks Fees20-2217Tournament FeesGirl's Fastpitch Softball Tournament Team Fee$400.94
Parks4.5Parks Fees20-2217Tournament FeesHoliday Classic Volleyball Tournament Team Fee$94.43
Parks4.5Parks Fees20-2236Tournament FeesHorseshoe Tournament$18.87
Parks4.5Parks Fees20-2236Tournament FeesSand Volleyball Tournament$28.30
Parks4.5Parks Fees20-2217Tournament FeesSlowpitch Softball Tournament Team Fee$259.43
Parks4.5Parks Fees20-2236Tournament FeesSpikeball Tournament$18.87
Parks4.5Parks Fees20-2236Tournament FeesVolleyball Tournament$94.34
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesAdult Day Trips $10 - $100
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesAdvanced Photography $75
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesAmazing Athletes$78
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesArt Fun with Miss Laura$25 - $50
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesBelly Dance$60 - $95
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesBigfoot Cartooning & Anime Classes$18
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesCopperplate Calligraphy$80
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesDigital Photography$75
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesGirls Fastpitch Softball Tournament Team Fee $542.45
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesIntroduction to the Sport of Fencing$120
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesJazzercise$25 - $150
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesKendo: Japanese Fencing$70
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesLine Dancing$28 - $120
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesLittle Pallet Art Classes$25 - $100
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesMartial Arts for All Ages, Beginning& Intermed. / Advanc.$45
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesMotions Dance/ Tumbling$15 - $20
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesPickleball$80
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesSenior Designated Substitute Player $80.91
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesSenior Morning League after July 1 $37.74
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesSenior Morning League between Memorial Day- July 1 $51.89
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesSenior Morning League Player Fee $61.32
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesSenior Night League After July 1 $47.17
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesSenior Night League between Memorial Day- July 1 $70.75
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesSenior Night League Player Fee $80.91
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesSkyhawk Sports$69 - $79
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesStarting New at Golf (SNAG)$80
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesTuesday Social Dancing$40 - $188
Parks4.6Activity Guide23-24242024 Winter/Spring Activity Guide Class FeesYoga$10 - $70
Parks4.7Lakeview Golf Course23-2423Golf Pass FeesNon-Resident 1/2 price$605
Parks4.7Lakeview Golf Course23-2423Golf Pass FeesNon-Resident Couple - Restricted (anytime on weekdays; afternoons only on weekends and holidays)$2,345
Parks4.7Lakeview Golf Course23-2423Golf Pass FeesNon-Resident Couple - Unlimited$3,089
Parks4.7Lakeview Golf Course23-2423Golf Pass FeesNon-Resident Junior - add on$343
Parks4.7Lakeview Golf Course23-2423Golf Pass FeesNon-Resident Senior Couple - Restricted (anytime on weekdays; afternoons only on weekends and holidays)$2,231
Parks4.7Lakeview Golf Course23-2423Golf Pass FeesNon-Resident Senior Couple - Unlimited$2,974
Parks4.7Lakeview Golf Course23-2423Golf Pass FeesNon-Resident Senior/Military - Restricted (anytime on weekdays; afternoons only on weekends and holidays)$1,316
Parks4.7Lakeview Golf Course23-2423Golf Pass FeesNon-Resident Senior/Military - Unlimited$1,888
Parks4.7Lakeview Golf Course23-2423Golf Pass FeesNon-Resident Single - Restricted (anytime on weekdays; afternoons only on weekends and holidays)$1,430
Parks4.7Lakeview Golf Course23-2423Golf Pass FeesNon-Resident Single - Unlimited$2,002
Parks4.7Lakeview Golf Course23-2423Golf Pass FeesPrivate Cart Trail Pass$302
Parks4.7Lakeview Golf Course22-2423Golf Pass FeesResident 1/2 price$550
Parks4.7Lakeview Golf Course22-2423Golf Pass FeesResident Couple - Restricted (anytime on weekdays; afternoons only on weekends and holidays)$2,131
Parks4.7Lakeview Golf Course22-2423Golf Pass FeesResident Couple - Unlimited$2,807
Parks4.7Lakeview Golf Course22-2423Golf Pass FeesResident Junior$311
Parks4.7Lakeview Golf Course22-2423Golf Pass FeesResident Senior Couple - Restricted (anytime on weekdays; afternoons only on weekends and holidays)$2,027
Parks4.7Lakeview Golf Course22-2423Golf Pass FeesResident Senior Couple - Unlimited$2,703
Parks4.7Lakeview Golf Course22-2423Golf Pass FeesResident Senior/Military - Restricted (anytime on weekdays; afternoons only on weekends and holidays)$1,195
Parks4.7Lakeview Golf Course22-2423Golf Pass FeesResident Senior/Military - Unlimited$1,715
Parks4.7Lakeview Golf Course22-2423Golf Pass FeesResident Single - Restricted (anytime on weekdays; afternoons only on weekends and holidays)$1,299
Parks4.7Lakeview Golf Course22-2423Golf Pass FeesResident Single - Unlimited$1,819
Parks4.7Lakeview Golf Course23-2423Green FeesCart - 18 holes$19
Parks4.7Lakeview Golf Course23-2423Green FeesCart - 9 holes$13
Parks4.7Lakeview Golf Course23-2367Green FeesCart Trail$14
Parks4.7Lakeview Golf Course23-2423Green FeesRange Token - Large Bucket$14
Parks4.7Lakeview Golf Course23-2423Green FeesRange Token - Small Bucket$8
Parks4.7Lakeview Golf Course23-2423Green FeesTwilight$35
Parks4.7Lakeview Golf Course23-2423Green FeesWeekday - 18 holes$39
Parks4.7Lakeview Golf Course23-2423Green FeesWeekday - 9 holes$29
Parks4.7Lakeview Golf Course23-2423Green FeesWeekday Junior - 18 holes$22
Parks4.7Lakeview Golf Course23-2423Green FeesWeekday Junior - 9 holes$14
Parks4.7Lakeview Golf Course23-2423Green FeesWeekday Senior - 18 holes$32
Parks4.7Lakeview Golf Course23-2423Green FeesWeekday Senior - 9 holes$30
Parks4.7Lakeview Golf Course23-2423Green FeesWeekend - 18 holes$44
Parks4.7Lakeview Golf Course23-2423Green FeesWeekend - 9 holes$33
Parks4.7Lakeview Golf Course23-2423Green FeesWeekend Junior - 18 holes$22
Parks4.7Lakeview Golf Course23-2423Green FeesWeekend Junior - 9 holes$14
Parks4.7Lakeview Golf Course22-2316Green FeesWinter - 18 holes$29
Parks4.7Lakeview Golf Course22-2316Green FeesWinter - 9 holes$21
Building5.1Impact Fees22-2004Fire Impact Fees 1,200 or lessResidential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$470
Building5.1Impact Fees22-2004Fire Impact Fees 1,201 to 1,700Residential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$726
Building5.1Impact Fees22-2004Fire Impact Fees 1,701 to 2,500Residential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$995
Building5.1Impact Fees22-2004Fire Impact Fees 2,501 to 3,200Residential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$1,192
Building5.1Impact Fees22-2004Fire Impact Fees 3,201 or moreResidential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$1,339
Building5.1Impact Fees22-2004Fire Impact NonresidentialAll Other (per square foot of building)$0.96
Building5.1Impact Fees22-2004Fire Impact NonresidentialCommercial (includes all buildings in a shopping center; all stand-alone retail buildings; and all restaurants and bars)$1.29
Building5.1Impact Fees22-2004Parks Impact Fees 1,201 to 1,700Residential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$3,006
Building5.1Impact Fees22-2004Parks Impact Fees 1,200 or lessResidential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$1,946
Building5.1Impact Fees22-2004Parks Impact Fees 1,701 to 2,500Residential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$4,119
Building5.1Impact Fees22-2004Parks Impact Fees 2,501 to 3,200Residential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$4,935
Building5.1Impact Fees22-2004Parks Impact Fees 3,201 or moreResidential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$5,544
Building5.1Impact Fees19-1827Parks Impact NonresidentialCommercial (Per square foot of building)$0.00
Building5.1Impact Fees22-2004Police Impact Fees 1,200 or lessResidential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$190
Building5.1Impact Fees22-2004Police Impact Fees 1,201 to 1,700Residential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$294
Building5.1Impact Fees22-2004Police Impact Fees 1,701 to 2,500Residential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$402
Building5.1Impact Fees22-2004Police Impact Fees 2,501 to 3,200Residential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$482
Building5.1Impact Fees22-2004Police Impact Fees 3,201 or moreResidential (per individual dwelling unit) by Square Feet of Climate-Controlled Floor Area) For multi-family residential structures the fee is based on the average size of units for the entire building. i.e. total building square feet of climate controlled space divided by the total number of indi$542
Building5.1Impact Fees22-2004Police Impact NonresidentialAll Other (per square foot of building)$0.19
Building5.1Impact Fees22-2004Police Impact NonresidentialCommercial (includes all buildings in a shopping center; all stand-alone retail buildings; and all restaurants and bars)$1.23